MANUAL PROGRAMMING - CNC MACHINIST
* MUST have 4-5 Year's MANUAL PROGRAMMING
will be required to:
Periodically update manuals to reflect product changes, design enhancements
requirements.
Develop comprehensive Product Manuals that detail the specifications, installation, operation
equipment.
Create Installation and Operation Manuals that guide users through the correct setup and
descriptions, understanding and usability of the manuals
Review and update existing documentation to
cover:
Product Manuals: Create comprehensive product manuals that include, but are not limited
Writer will be required to: Periodically update manuals to reflect product changes, design enhancements regulatory requirements. Develop comprehensive Product Manuals that detail the specifications, installation, operation our equipment. Create Installation and Operation Manuals that guide users through the correct setup and descriptions, understanding and usability of the manuals Review and update existing documentation to reflect should in essence cover: Product Manuals: Create comprehensive product manuals that include, but are not limited
requirements. Estimation and arranging of contract labour to supplement existing resources to meet maintenance engineering plant breakdowns Ability to read maintenance manuals and Engineering Drawings (P&IDs, SLDs, Isometric
clients' Manual and Service Literature. By following directives provided in Workshop Manuals, produce maintenance instructions and specifications as per the manual. Ensure excellence in customer service delivery correct repair work. Ability to interpret technical manuals and specifications and put into practice. Must
directives provided in Workshop Manuals. Interpret our clients' manuals, specifications, directives and maintenance instructions and specifications provided in Manual and Service Literature. Follow procedures/processes Ability to apply correct interpretation of technical manuals and specifications in practice. Must be able to
applicable/completed job card recording consumables, parts/spares/labour etc. and that the applicable mark-up has been applied Check allocations of van stock/materials used/labour etc. is accurately recorded from completed job planning and time management Operational system and manual administration is maintained accurately and up
applicable/completed job card recording consumables, parts/spares/labour etc. and that the applicable mark-up has been applied Check allocations of van stock/materials used/labour etc. is accurately recorded from completed job planning and time management Operational system and manual administration is maintained accurately and up
requires SHEQ Manager Manage Quality Assurance Manual/Procedures Draw up (QCP's) and ITP for new project
Engineering Drawings Red Seal in Turning Able to program Manual (Fanuc) and Mastercam Handover machine to operator