of Engineering Software
schematics, wiring diagrams electrical schedules, cable block diagrams, earthing drawings, power system supplies (UPS), protection, power and control cabling Routing and racking Lighting and small power installations
installations. Electrical Construction: i.e., strap and lay cables; installation and maintenance of low voltage networks; positioning of equipment; join low/medium voltage cables etc. Electrical Installations: install and commission DC machines, install and terminate low voltage cables and conductors etc. Electrical Maintenance: maintain
lay of cables etc.
commissioning, and repairs of control systems and insulated cables.
points Selecting, cutting and connecting wire and cable to terminals and connectors Using electrical and
transfer switches 100A & 800A Installation of cabling 3 Phase electrical work and control panel building
Minimum of 8 years' experience working with HV and HT Cables. Minimum of 8 years' experience working with Substations
Loop Drawings, MCC / PLC Cabinet Layout Drawings, Cable Schedules, Termination Drawings, BOQs, etc Assess
required electrical systems, such as switchboards, cable reticulation & supporting systems, lighting