site drawing control –registration of drawings, maintaining current revision status, controlled issue
site drawing control –registration of drawings, maintaining current revision status, controlled issue
Follow the drawing control procedure as per QP 1101, Section 2.1 Ensure that the Drawing Control Cards are
Follow the drawing control procedure as per QP 1101, Section 2.1 Ensure that the Drawing Control Cards are
design improvements Creating operation manuals, drawing control, BOMs, fitment instructions, etc Competent
Revised each time changes are done. Manage drawing control through issue to relevant personnel and transmittals/emails
/>Administrative Functions:
Drawing Register Control
Follow-up on any queries on Engineering
NOTICES (ECN) Administrative Functions: Drawing Register Control Follow-up on any queries on Engineering
all drawing specifications and standards are adhered to
engineering drawings
- Standards for all drawings and quality control of all drawings prior to submission